Chitwan Medical College

A 750-bed teaching hospital in Bharatpur offering advanced healthcare and specialized oncology services.

Chitwan Medical College

A 750-bed teaching hospital in Bharatpur offering advanced healthcare and specialized oncology services.
Location

Bharatpur, Nepal

Project Type

Institutional Infrastructure

Total Budget

Rs. 5.5 Cr.

Duration

18 Months

Status

Chitwan Medical College (CMC) is a prominent private medical institution and a 750-bed teaching hospital located in Bharatpur, Nepal. As a key healthcare provider in the region, the facility demands reliable infrastructure and high-performance systems to support continuous medical operations.

This project focused on upgrading critical systems within the hospital to enhance safety, functionality, and efficiency. All works were carefully planned and executed within an active hospital environment, ensuring minimal disruption while maintaining strict quality and safety standards.

Project Overview

The project involved upgrading the fire hydrant system, interior spaces, and the main electrical distribution system to improve overall safety, usability, and infrastructure performance. The work was executed with an integrated approach, ensuring efficient coordination and minimal impact on ongoing hospital operations.

Highlight Points

Scope of Work (What We Delivered)

Fire Hydrant System

Installation and upgrading of the fire hydrant network, including pipelines, pumps, valves, and hydrant points for improved fire safety.

Interior Works

Execution of partitioning, false ceilings, flooring, and finishing works to enhance functionality and interior spaces.

Electrical Distribution System

Upgradation of panels, cabling, and load management systems to ensure reliable and uninterrupted power supply.

Testing & Commissioning

Complete system testing, inspection, and commissioning to ensure safety, performance, and operational readiness.

Challenges & Solutions

Challenge

The project was executed within an operational hospital, requiring uninterrupted medical services. Space constraints and existing utilities made system installation complex, while interior works needed careful coordination in occupied areas. Electrical upgrades also required controlled shutdowns and continuous power supply to critical zones.

Solution

A phased execution approach and close coordination with hospital staff ensured minimal disruption. Systems were efficiently integrated within existing structures, and electrical work was managed with planned shutdowns and backup support, ensuring smooth and safe project completion.

Project Gallery

Project Results & Impact

The successful completion of the fire hydrant system, interior works, and main electrical distribution system upgrade has significantly improved the overall infrastructure and operational efficiency of the facility. The upgraded fire hydrant system has enhanced fire safety and emergency preparedness, ensuring quicker response and better protection for patients, staff, and property. The interior works have created a more functional, organized, and comfortable environment, contributing to improved patient experience and staff productivity. Furthermore, the upgraded main distribution system has ensured a more reliable and stable power supply, reducing the risk of electrical failures, especially in critical areas such as ICUs and operation theaters. Overall, the project has strengthened safety standards, improved service delivery, and supported the hospital in maintaining high-quality healthcare operations.